Heavy Industry lifting electric winch machine for bridge erection

China Bridge Erecting Machine Factory - Modern Heavy Industry

b'Bridge erecting machine is a device for placing precast beams into precast piers.. The bridge erection machine belongs to the category of crane, because its main function is to lift up beams, and then transport them to the location and put them down. But it is quite different from a crane in general sense. The requirements are strict, and there are beams running on them, or vertical movements.'

Rubber Tyred Gantry Crane - Home | Facebook

b'Rubber Tyred Gantry Crane. 437 likes. Rubber Tyred Gantry Crane are often used in construction site, precast yard, bridge building, power plant section and other equipment transferring shop.'

100T Launching Gantry System by Huada Heavy Industry ...

b'Generally it is composed of the main beam, leg and winch trolley, the main girder is used for bearing, the leg is to execute machine transverse moving, longitudinal moving, leveling, support, cross span, cross scale and other functions, and the winch trolley used for lifting \xe2\x80\xa6'

China Heavy Duty Electric Winch, Heavy Duty Electric Winch ...

b'China Heavy Duty Electric Winch manufacturers - Select 2021 high quality Heavy Duty Electric Winch products in best price from certified Chinese Electric Winche, Heavy Duty Truck Tyre suppliers, wholesalers and factory on Made-in-China.com'

Power industry PROVEN AND RELIABLE LIFTING SOLUTIONS

b'the challenges of lifting equipment in power plants in the power industry, the focus of the lifting equipment lies on the turbine building cranes. they are a key component during the erection stage of the plant and further on in the maintenance of the turbines and \xe2\x80\xa6'

CN102071650A - Inside and outside general bridge girder ...

b'The invention discloses an inside and outside general bridge girder erection machine for a high speed railway tunnel and a girder erecting technology thereof. Double girders (3) of the bridge girder erection machine are provided with two smooth hanging girder crown blocks (2); the front ends of double girders (3) are provided with front landing legs (4) and assistant landing legs (5); the tail ...'

Overhead traveling crane, Overhead crane - All industrial ...

b'Lift capacity: 6,300 kg - 63,000 kg Lifting speed: 10,000 mm/min - 20,000 mm/min. Konecranes M-series open winch crane - The modular masterpiece The Konecranes M-Series is heavy lifting redefined. Built in various sizes for demanding processes, the Konecranes M-series introduces a new level of modularity ...'

Launching Girder Bridge Construction - Posts | Facebook

b'General underslung segment bridge construction machine is composed of the main beam, leg and winch trolley, the main girder is used for bearing, the leg is to execute machine transverse moving, longitudinal moving, leveling, support, cross span, cross scale and other function, and the winch trolley used for lifting the precast girder.'